How to accept the aluminum expanded metal mesh when receiving the goods?

1. Check whether there are any broken wires or holes.

Since the steel-aluminum expanded mesh uses special machinery to directly shear and stretch the metal plate, physical deformation of the metal plate occurs during this process, and breakage, cracking, etc. are inevitable, especially when the carbon content of the metal plate is relatively high. This problem is especially likely to occur when the hardness is relatively high, so it is necessary to check this item.

2. Check and measure whether the specifications are consistent with the requirements

Checking the specifications of the goods is a necessary step for any acceptance, and the same is true for the acceptance of steel and aluminum expanded mesh. This includes the external dimensions of the expanded steel and aluminum mesh, such as length and width, mesh size, and stem width and thickness. Other requirements are also checked.

3. Whether the surface treatment is fully covered and whether the bottom is exposed?

In many cases, it is necessary to galvanize, spray, dip or paint the surface of the expanded steel and aluminum mesh. The purpose is to prevent the expanded steel and aluminum mesh from being corroded and rusted by the outside world. In this case, it is necessary to check the quality of its covering coating. The main thing is to check whether the coating coverage is complete, whether there is any bottom exposure problem, whether the coverage thickness is uniform or up to standard, whether the color meets the requirements, etc.

Appearance inspection: including surface defects, length, width, thickness, end rectangularity ratio, straightness and lock shape, etc. Note:

a. Welding parts that affect the driving of steel sheet piles should be cut off; b. Holes and section defects should be reinforced; c. If the steel-aluminum expanded mesh is severely corroded, its actual section thickness should be measured. In principle, all steel sheet piles should be inspected for appearance quality.

未命名

Post time: Sep-21-2023